Describe one work scene
Record the machine type, target task, operator involvement and operating environment. A hypothetical project might involve an excavator detecting ground conditions and adjusting bucket depth within an operator-defined area. This illustration describes a proposed task and carries no client-case or tested-performance claim.
Map the scene into sensing, decision, action and feedback, identifying the device responsible at each stage. NIST’s 2017 publication offers historical research context on construction metrology, object tracking and sensor-data exchange. Its scope does not establish current market adoption. [3]
Record inputs and outputs in four research areas
The terms below are examples for planning combinations. Check the database’s fields and operator syntax before applying them, and record the search date, query, scope and result count.
| Area | Question for the team | Example English terms | Evidence to compare |
|---|---|---|---|
| Sensors and localisation | Which objects and coordinates are measured? | excavator + lidar / terrain / localization | Sensor layout, coordinate transforms and error conditions |
| Decisions and task planning | Which action follows each state? | earthmoving + trajectory / task planning | State transitions, work sequence and replanning conditions |
| Control and feedback | How is the difference between commands and motion corrected? | construction machine + hydraulic / feedback control | Control blocks, inputs, outputs and correction intervals |
| Working mechanisms and connections | Which mechanisms transmit force and motion? | excavator + bucket / linkage / attachment | Bucket, linkage and mounting drawings with connections |
Check machine and control classifications together
E02F provides an entry point for earthmoving equipment. Consider E02F 9/20 for drives and controls and E02F 9/22 for hydraulic drives and controls, then check relevant subgroups and references. Add machine-specific classes for cranes or road-construction equipment as appropriate. [1]
For vehicle position and course control, also examine the G05D 1/00 family. The checked 2026.08 scheme includes ongoing reclassification and frozen older groups. Review links between older and newer groups and the warning notes when reusing a query, alongside keyword searches. These symbols provide starting points with a defined scope. [2]
Compare functions and connections in the original documents
For each candidate, log the publication number, priority and publication dates, relevant figures and claims, and the sensor inputs, decision conditions, control outputs and mechanical connections. Relevant functions can appear in the description or claims even when the title omits “autonomous”.
In the hypothetical project, identify whether the improvement concerns the sensor, control switching in response to sensor error, or bucket actuation. Link each improvement to the closest document and its precise supporting passage to clarify the technical relationship and evidence needed for drafting.
Use the research log to prepare filing and implementation review
Collect system drawings, control flows, differences from the earlier approach and reproducible operating conditions. For experiments, record the reference machine, load, terrain, sensor occlusion and measurement method. Label simulation outputs and field measurements separately.
For implementation, manufacture or export, define the country and intended product or process, then examine claims and legal status. Track relevant pending applications and changes to their claims. [4] [5]
Frequently asked questions
Can I search only for “autonomous excavator”?
Combine machine names with synonyms for the relevant sensor, planning, hydraulic-control or bucket-linkage function. After reading representative documents, extend through classifications, applicants and citations to address missing terminology.
What information helps start the research?
Provide the machine type, work scene, system drawing, sensor list, control flow, problem to improve, planned disclosure or demonstration dates and target countries.
Prepare for an enquiry
Prepare a one-page work scene, system drawing, control flow, proposed improvements, known documents and research objective. Target countries and planned disclosure or demonstration dates help define prior-art research, filing preparation and freedom-to-operate review.
Email us to discuss the scope of research or review. contact@i2bpat.co.kr
Official sources and scope
- USPTO / EPO — CPC E02F — 2026.08 · E02F 3/00, 9/20, 9/22 · 2026-11-22
- USPTO / EPO — CPC G05D — 2026.08 · G05D 1/00 notes and reclassification warnings · 2026-11-22
- NIST — Research in Autonomous Construction — Published 2017-02-19 · Abstract, construction testbed and sensor data · 2026-11-22
- WIPO — PATENTSCOPE glossary — Web guidance · Freedom-to-Operate Search · 2026-11-22
- WIPO — Tool 5, Freedom to Operate — Toolkit PDF · Current legal status and pending applications, printed p.12 · 2026-11-22
Official classifications and public research were checked on 22 November 2026. The table and search terms are I2B’s practical suggestions. Individual patent searches, statistical counts and validity or infringement determinations were outside this article’s research scope.