Two programs display a pipe and a beam. One raises an alert when their shapes intersect. The other also raises an alert when there is too little room for installation, even if the shapes never touch. Both might be called BIM clash detection. A prior-art search for the second program needs to capture how it distinguishes those cases. Consider a hypothetical example.
1. Choose two inputs that produce different alerts
Suppose the minimum distance from the outside of the pipe to the beam surface is 18 mm. The required clearance set for this pipe is 25 mm. The shapes do not overlap, but the program flags a shortfall of 7 mm. Move the same pipe so that the minimum distance is 30 mm, and the alert disappears. These figures are illustrative assumptions, not legal or construction requirements.
Ask the developer what changed the result. Does the program transform the models into a common coordinate system before measuring between surfaces? Which attribute selects the clearance requirement? How does the program associate the result with the affected elements?
2. Record the standard input and the operations your code performs
IFC is a data schema for exchanging construction and facility management information between applications.[1] Knowing that a program reads IFC does not explain how it computes the alert. Record each input model’s version, units and coordinate system. Mark the values your code converts or derives. The table illustrates a search brief for this example.
| Stage | Example implementation | Question for the reference |
|---|---|---|
| Input | Pipe and beam geometry, coordinate systems and units of each model | Which geometry and placement data does it accept? |
| Alignment | Convert both shapes to common coordinates and units | How are positions reconciled across models? |
| Decision | Compare minimum surface distance with an element-specific threshold | How is the threshold selected, and can an alert occur without overlap? |
| Output | Display element IDs, shortfall and location together | Can a reviewer locate both elements and the affected point again? |
Scroll horizontally if the table is wider than your screen.
3. Alternate between object terms and processing terms
Start by combining pipe and beam with clearance or minimum separation. For Korean publications, try 배관 and 보 with 이격거리 or 여유 공간. Then drop BIM and broaden the search with geometric terms such as 3D model, surface distance and threshold. If the results are too broad, add one condition present in the actual implementation, such as coordinate transformation or selection of a clearance by element type.
WIPO’s PATENTSCOPE FAQ explains how keyword searches can be supplemented with the International Patent Classification (IPC).[2] Take a classification symbol from a close reference, check its definition, then compare results in that class with the keyword results. Record the date, database, fields, terms and reasons for keeping or excluding a reference.
4. Locate the passage that answers each question
A publication that mentions displaying a clash is worth screening. Read its description, drawings and claims. Record the paragraph or figure that describes shape intersection, distance between surfaces or selection of a threshold from an element attribute. If the threshold-selection method cannot be found, mark it unverified and continue searching.
For a review, prepare an anonymized input sample, the sequence of coordinate and unit conversions, screenshots with and without the alert, the threshold table, and publication numbers and dates of candidate references. A pre-filing prior-art search and a pre-launch review of third-party rights serve different purposes. The latter also requires a separate check of legal status and claims in force in each target jurisdiction.
Key takeaway
Give inputs, transformations, decisions and outputs one line each in the search brief. Attach an implementation record and the relevant passage in each publication to the corresponding line. The resulting map shows what is documented and where the search should continue.
Official sources and scope
Checked on 2026-11-01. Sources are used within the scope stated below. Tables, search terms, procedures and hypothetical examples are I2B practical suggestions, not mandatory official forms or conclusions on an individual case.
- ISO 16739-1:2024 · IFC data schema for construction and facility management — The public abstract describes the purpose of IFC data exchange. The distances and decision rule in the example are hypothetical design choices.
- WIPO · PATENTSCOPE search FAQ — The FAQ explains keyword and IPC searches. No hit counts or findings are reported for the example terms.
Related reading
Does a published roadmap target affect the novelty of your invention in Korea?
Turning an AI technology roadmap into prior-art search keywords
Turning a robotics roadmap into a function-and-structure patent search scope
Prepare for a consultation
Share a non-confidential technical outline, search purpose, target countries and a list of available records. Agree on a transmission method before providing confidential materials.
Contact information