Define the search around the module lifecycle
First decide the purpose: finding technical references, comparing similar arrangements before filing, or examining IP risks for a planned business activity in a particular country. That purpose determines the documents and relevant dates to review.
A UK government study addresses transport, site installation and structural connections in separate sections.[1] As a practical starting point, compare drawings of the module at factory dispatch, during transport, after installation and when complete. The study concerns construction in England; it does not establish Korean approval or safety requirements.
Specify what to search at each stage
The following table helps frame patent-search questions. It is an editorial checklist, not a structural-safety assessment or construction acceptance test.
| Search area | Features to identify in drawings or processes | Starting terms |
|---|---|---|
| Modules and connections | Column, beam and corner joints; load paths; fastening direction and access | modular building, volumetric module, inter-module connection |
| Transport restraint and protection | Restraint frames, temporary bracing, vibration/deformation protection and removal conditions | transport frame, restraint, temporary bracing |
| Lifting and positioning | Lifting points, jigs, guides, alignment and levelling arrangements | lifting point, lifting jig, alignment, levelling |
| Site assembly and finishing | Fixing sequence, joint work, service connections, water and acoustic sealing | assembly sequence, service connection, joint sealing |
Expand keywords together with classifications
CPC E04B 1/348 covers structures made from units comprising substantial parts of two sides of a room, including box-like or cell-like units; E04G 21/14 covers conveying or assembling building elements.[2][3] These are example entry points. Transport restraints and connection components may appear elsewhere, so follow the classifications and citations of relevant documents.
An initial concept combination could be ("modular building" OR "volumetric module") AND (connector OR alignment), or ("building module" AND transport AND restraint). Also consider Korean terms for modular, industrialised and prefabricated construction. These are Boolean concepts, not validated queries for a specific database; adapt fields and syntax to the service used.
Record relationships between stages in the comparison table
For each relevant document, record publication number, priority and publication dates, lifecycle stage, connection layout, work sequence, drawing numbers and claim mapping. Ask whether a factory restraint is removed after delivery, or whether the same fastener serves both lifting and final fixing.
Keep each document’s verified disclosure separate from your interpretation and open questions. Combining a drawing from one document with an effect described in another does not establish a verified implementation. Describe differences in connection location, load path and work sequence even when appearances are similar.
Connect business-use review with countries, claims and legal status
Preparation for a freedom-to-operate review includes the country and time of the planned activity, relevant claims and current legal status.[4] Identify manufacturing and installation countries, transport routes, assembly parties and the supplied components when defining the instructions.
Avoid inferring hidden connections solely from a competitor’s construction photographs or catalogue. Actual drawings, contractual supply scope and site-work descriptions help fill gaps in the comparison. Record changes to the design version or installation country that affect the search assumptions.
Frequently asked questions
Is searching only for “modular construction” sufficient?
Add terms for connections, transport restraints, lifting jigs and installation sequences. Use relevant documents to expand classifications, synonyms and cited references.
Can a business proceed if few granted patents are found?
A document count alone does not establish the level of IP risk. Review publication delays, query and language coverage, target countries, and the claims and current legal status of relevant documents.
Prepare for an enquiry
Prepare module and connection drawings, the sequence from factory dispatch to installation, transport and lifting conditions, differences from existing designs, manufacturing and installation countries and dates, and any known patent numbers. Agree the scope of disclosure before sending confidential drawings.
Email us to discuss the scope of research or review. contact@i2bpat.co.kr
Official sources and scope
- UK MHCLG — Volumetric Modular Construction research — Finalised July 2022; published 2024-11-26; England · Sections 6 Transportation, 7 Site installation, 11.2.2 and 11.2.6–7 · 2026-11-24
- USPTO / EPO — CPC E04B — 2026.08 · E04B 1/348 and related subgroups · 2026-11-24
- USPTO / EPO — CPC E04G — 2026.08 · E04G 21/14 and related references · 2026-11-24
- WIPO — Toolkit, Tool 5: Freedom to Operate — Toolkit PDF; linked 2020 guide · Printed pp.4–6, claims, country/time scope and legal status · 2026-11-24
As of 2026-11-24. Classifications, keywords and tables are practical search-planning suggestions. This article does not determine the novelty, inventive step or scope of an individual patent, or freedom to operate for a specific product.
Related reading
- Autonomous construction equipment patents — searching sensors, controls and working mechanisms
- Low-carbon concrete patent searches — comparing compositions, additions and processes
- Turning R&D results into a patent description and claims
- Freedom to operate before launch and responding to patent warning letters